Creating and editing a project: starting points, people and features
Describes Projects 0.34.0.
A project is a container for work: a task list with its own views, plus whatever extensions you switch on, such as files, events or a public portal. This guide covers the form you create a project with and the same form when you edit one later.
Where to find it
On the Projects list, press New project (/admin/projects/new). To edit, use Edit in a project’s ⋮ menu, on the list or on the project’s own page (/admin/projects/<id>/edit). On a project page the form opens as a sheet over the page; it also works at its own address.
You need the Projects permission. Whoever creates a project becomes its owner.
A new project: name it, choose whether it ends, and pick a starting point.
Name, description and key
The form has three tabs: Project, Schedule and Settings. A tab with a problem in it is marked when you save.
On Project, type the Project name and a description. The Key is the project’s short name: its tasks are numbered with it (a key of WEB gives WEB-1, WEB-2), and it works in links and on the API. Leave it empty on a new project to get the key the form suggests. You can change it later; the old key keeps working and is listed under “Also answers to”.
Choose a starting point
Choose a starting point offers cards. Each one sets which features and extensions start on; Current setup: under it summarizes the choice, and Customize capabilities ↓ takes you to the details.
- Simple checklist: “A shared checklist — no assignees, dates, or tracking.” Files and discussions start off.
- Team project: “Day-to-day team work with assignees, due dates, board and timeline views.”
- Public intake: outsiders submit requests through a private link. This card shows only when the public portal extension is available.
- Just a space: no task list, only the tabs you pick, such as whiteboards or events.
Whatever you pick, “Everything here can be changed later in Modules & features.”
Start from and schedule
- From template: copy a template’s tasks and dependencies into the new project, or Start from scratch. A picked template shows how many tasks it brings, the first few titles and the extensions it brings. “Template capabilities carry over; your choices below win.”
- Start: Immediately (set up tasks first) or Scheduled date, which reveals Start date and time.
- Statuses: which workflow status list the project uses. “Statuses lock in when the project starts.”
- Count weekends in schedule: whether weekends count as working days in the project’s schedule math.
People & permissions
You’re listed as You — Owner. Add to project opens a dialog: search people, teams or departments in Who, pick a Role on this project and press Add:
- Viewer — can look, not change
- Member — normal access
- Manager — can also restrict what others do
For a team or department, “Everyone in it gets this role, including people who join later.” With nobody added, the project “starts private to you and site admins.”
Who can do what sets, per action, who may do it on this project. The members page has the same controls; see the guide on project members and access.
Task features and extensions
Task features holds the Tasks switch (“A task list with its board, timeline and calendar”) and, under it, one tick per feature: Task library, In-progress step, Assignees, Subtasks, Waiting on and requested by, Start and end dates, Estimates & durations, Progress tracking, Dependencies, Workflow statuses, Scheduling & ETA, Sub-projects, Priorities, Labels, Work ledger, Start & finish, Board view, Timeline view, Calendar view, Time logging on the project, Billable time and Sub-project status follows its tasks. Some features need another one on; the form lists what each needs.
Extensions switches on whole areas: Files, Whiteboards, Events, Discussions and Public portal, plus any extension another installed module adds.
Press Create. The message is “Project created.”, or “Project created from template with all tasks and dependencies.”
Editing a project
The edit form has the same three tabs, with more on them:
- Project: name, description, key, Assignees for the project, its Files, and How it ends. Has an end means “It finishes when its last task is done.” Ongoing means it never finishes on its own; on an ongoing project the form shows End this project, which marks it completed and takes it out of the active lists (“Its tasks stay as they are”), and Reopen it afterwards.
- Schedule: the start and Count weekends in schedule. For a sub-project, Waits on lists items in the parent that must finish first.
- Settings: a Cover image; a Link to a page elsewhere (with Address, Button text, Show the button, Icon and Opens); the Header items to show (“Ongoing” beside the name, Since when it runs, How many tasks are open); The task list, which sets How it looks (Automatic — a text list until a feature needs more room, Always a text list — type, paste, Enter for the next, Always task cards) and a few list options; and What an AI agent may do here.
Press Save. Closing with unsaved changes asks “Discard your changes?”
Editing an existing project opens the same form, filled in.
What it doesn’t do
- The workflow status list locks in when the project starts: later edits to the site’s status list don’t reach a running project.
- A group (team, department or site role) can’t own a project; ownership stays with a person.
- Turning off Subtasks flattens the list for new work, but subtasks already made keep their place.