Projects 0.33.0: Deadlines, recurring tasks, multiple assignees and a Time page
Projects 0.33.0 is the biggest update yet to the PhoenixKit project management module: tasks get deadlines and real start times, they can repeat and have several assignees, and a new Time page compares what was planned with what happened.
Deadlines and a Time page
A task now has a deadline, a real start time and planned clock times, and a project can link to an outside page. Calendars show deadlines and planned times. The new Time page shows each person’s tasks for a day or a week: the planned span next to what really happened, how late it ran and the time logged. A task is now overdue only by its deadline, not by its end date.
The new Time page: what was planned for each person today next to what happened.
Recurring tasks and several assignees
A repeating task stays done when finished, and one new task appears for the next date. Tasks, projects, sub-projects and library tasks can have several assignees: people, teams or whole departments, all equal. When a task is completed, “Next up” asks which tasks it unlocks and who to tell.
The board now accepts drag and drop, re-checked on the server; a task can turn into a sub-project and back; and descriptions use the Leaf editor with pictures. New tasks now start in a fourth status, waiting, next to todo (shown as “can be started”), in_progress and done, and API clients see it too. Project-wide and billable time tracking are switches, off by default, turned on per site or per project; while project-wide time is off, logging time needs a task, and the API’s POST /time without one answers 422 task_required.
The task board in Projects 0.33: the new Waiting column, deadlines, and tasks shared by two people.
Upgrading
Run mix phoenix_kit.update: the module’s migrations move from V25 to V30. Projects 0.33 needs PhoenixKit 3.3 or later, Staff 0.11.1 or later and AI 0.28 or later. Tasks that were overdue by their end date stop showing as overdue until they are given a deadline.
Full release notes: Projects 0.33.0
0.33.0 · 6 November 2026
PRs #59–#62 plus their post-merge reviews
(dev_docs/pull_requests/2026/59-tasks-deadlines-time-page/ through
62-fresh-core3-chain/).
Run mix phoenix_kit.update after upgrading: the module’s chain moves V25 → V30,
and the new floors bring core V226–V227 and phoenix_kit_ai‘s V6. A host below
core V225 must install core 2.65.0 first (core’s own rule). See “Changed” for
what behaves differently on an existing install.
Changed
- Requires
phoenix_kit>= 3.3.0 (pin>= 3.3.0 and < 4.0.0, was>= 2.65.0): the release this package is built and tested against, and the first on Hex since 3.0.0. Embedded identity and the notification fan-outs now call core directly, with no fallback for an older one. - Requires
phoenix_kit_staff>= 0.11.1 (pin>= 0.11.1 and < 1.0.0): itsup/1never lowers its marker, which a host’s older staff migration file could otherwise do after this chain has run.phoenix_kit_aiis now~> 0.28(was~> 0.27). - Schema chain V25 → V30. V26 a task’s deadline, real start and planned times, and a project’s link; V27 a task’s own files; V28 repeating tasks; V29 several assignees on a task; V30 several assignees on a project, a sub-project and a library task. The
assigned_*/default_assigned_*columns stay as a one-assignee mirror, anddownrefuses while a holder has several. - A task is overdue only by its
deadline, no longer by its end date, on the page and in the API’soverdueandcounts.overdue. V26 does not backfill deadlines, so a task that read as overdue stops doing so until it is given one. - New tasks start as
waiting, a fourth status besidetodo(shown as “can be started”),in_progressanddone. API clients see it too. - Time on the project as a whole and billable time are switches, off by default (
project_time,billable). Whileproject_timeis off, Log time needs a task andPOST /timewithout one answers 422task_required. Turn either on for the site on Settings → Project Features, or per project. - API: tasks and projects answer
assignees, andassigneeonly while there is exactly one. Writes take either. - A sub-project that finishes by itself releases nothing on its own. The page that handled the last Done opens “next up” for the rows it unlocks. The API or a job collects nothing, so nothing is released.
- The open task in an embed host’s address is opt-in: pass the
"url_param"session key to name the parameter. Without it the address is left alone. The module’s own project page still passes it. - The project page, task form, popups, board and lists are reworked: compact headers, Save and Close, one assignee picker, shared time and duration inputs, one question per confirm dialog.
Added
- Time page (
projects/time): per person, for a day or a week, each task’s planned span against what really happened, with the late part and the logged time. - Deadlines, real times and a project link:
deadline,started_at, wall-clockstart_time/end_timeon a task, andexternal_url/external_labelon a project. Calendars show deadlines and planned times. - A task view popup apart from the edit form, and a board that takes drops, re-checked on the server.
- Next up: completing a task asks which tasks it unlocks, who to tell and which to keep idle. “Ready to start” asks the same.
- Several assignees on tasks, projects, sub-projects and library tasks: people, teams and departments, all equal. The picker searches, remembers recent picks, finds a team’s and a department’s people, and can assign any user by creating their staff record.
- Repeating tasks: a finished one stays done and one new task comes for the next date, from every path that finishes it.
- Turning a task into a sub-project and back, in place. Back to a task needs
:edit_tasksin both projects. - A task’s own files and the Leaf description editor. Pictures can go into project, sub-project, template and library task descriptions too, and a project can have a cover picture.
- The library picker: search first, then Recent, Often used and A–Z, with several tasks added at once. Suggestions appear while typing a task’s title.
- The
"embedded"feature preset, for a host that keeps a project on a record of its own, with"ongoing"and an immediate start in onecreate_project/2call. - Site defaults for project features on Settings → Project Features, an All comments tab, a Day view on the Calendar tab, and what changed, from what to what in the history.
- Activity actions:
projects.assignment_made_ready/_made_idle,projects.assignment_ready,projects.assignment_made_subproject/_made_task,projects.task_file_added/_removed,projects.feature_default_set,projects.staff_person_created,projects.project_access_updated.
Fixed
- A fresh install on core 3.x failed in this chain. Its foreign keys point at staff’s and entities’ tables, which core no longer creates, so
up/1now runs their chains first. It also adds document_creator’s key to projects when that module installed first, clearing links to projects deleted in the meantime. - A member could change a sub-project’s tasks with only the parent’s rights. An expanded sub-project’s row is now checked against its own project.
- A stale page could overwrite a task’s newer status. Status steps now compare against the row as stored.
- Calendars, contributed tabs and language tabs printed English on other pages, and the Calendar tab’s Week and Day opened on the wrong day and at midnight.
- The time logs showed an account by its email when its staff person had a name.
Projects 0.33.0. Install or update: {:phoenix_kit_projects, "~> 0.33"}, then mix deps.get && mix phoenix_kit.update. Full history: CHANGELOG.