Projects 0.14.0: The Timeline keeps your own task order
Projects 0.14.0 puts the Timeline chart back in your order. Tasks are charted exactly where you dragged them, instead of being re-sorted so that every prerequisite comes first.
Your order, honest arrows
Projects 0.13.0 moved each prerequisite above the task that depends on it, so arrows always pointed forward. The catch was that the chart no longer matched the order people had set by hand. With the new version of the chart library, arrows stay readable in any order, so that re-sorting is no longer needed and is removed.
When your order puts a task before something it depends on, the chart now draws a backward arrow between them instead of quietly moving the rows. If task B depends on task A but you dragged B above A, B stays on top and the arrow runs back from A to B, so the chart shows the order as it really is. Dependencies are still read across the whole project tree for the arrows, and the rows still follow the tree, with a sub-project’s tasks under it as before. The List tab and the saved positions were never changed by the old sorting, and still are not.
This undoes the main change of 0.13.0, which is why it is a new minor release rather than a patch.
Upgrading
No migration and no configuration. Update the dependency; it needs phoenix_live_gantt 0.3 (was 0.1), which mix deps.get fetches. On older versions of that library, an order that breaks a dependency drew a tangled detour.
Full release notes: Projects 0.14.0
0.14.0 · 22 June 2026
Timeline (Gantt) keeps the user’s manual order — it no longer reorders tasks by dependency. This reverses 0.13.0’s dependency-ordering: phoenix_live_gantt 0.3.0 ships a connector router that lays out any task order followably, so the Timeline now charts tasks in the exact order the user drag-positioned them. When a manual order places a dependent before its prerequisite, the chart draws an honest backward finish-to-start arrow rather than silently re-sorting the rows behind the user’s back. Pairs with phoenix_live_gantt 0.3.0 (order-independent connector routing).
Changed
- The Timeline respects drag order, not dependency order.
ProjectGanttLivelays the waterfall out by each project’s rawpositionagain (Layout.sequential:order), and the flattened-tree row order is preserved as before viaextra.order. 0.13.0 inserted a topological pre-sort so a prerequisite was always charted above its dependent; with 0.3.0’s router that reorder is no longer needed — a backward dependency is now shown, not hidden. Behaviorally this is a revert of 0.13.0’s headline change, which is why it lands as a new minor rather than a patch on top of it. - Dependency floor raised —
phoenix_live_gantt~> 0.1→~> 0.3. 0.3.0 is the floor because the order-independent connector router is what makes laying tasks out in raw drag order followable; on 0.2.x a violating order drew a tangled backward “conflict” detour.mix.lockmovesphoenix_live_gantt0.2.0 → 0.3.0.
Internal
- Removed
order_by_dependencies/2andemit_in_dependency_order/4fromProjectGanttLive(the greedy stable topological sort, ~70 lines) — the layout no longer pre-sorts, so the helpers and theirProjects.list_all_dependencies/1read for ordering are gone (dependencies are still gathered tree-wide for the connectors). The rewritten “keeps the user’s drag order” test now also asserts the backward dependency still renders as a connector (data-from-id/data-to-id), so the order-independent-routing claim is verified, not just commented.
Projects 0.14.0. Install or update: {:phoenix_kit_projects, "~> 0.14"}, then mix deps.get && mix phoenix_kit.update. Full history: CHANGELOG.